STEPS TO DRILLING A WATER WELL


Natural filter-cell


The drilled well has to be cleaned thoroughly and a so-called natural filter-cell has to be formed by professional pumping. The water pumping should be started with lower discharge intensity. After cleaning of water and becoming the working level can be increased the discharge intensity until the required water yield will be one and a half times. The pumped water yield and the water level of well have to bee measured at least hourly during the pumping.

These data are necessary to request of the water permit. After building a well, analysis of the water quality is obligatory due to the fact that this is the only way to decide the possible usage form of the water.

Would you like your own water well?


Please contact our company or call us! Entrust us with the well-drilling!

manager

Krizsanyik László

Email

kutfurok@kutfurok.hu

Phone

06 30 / 489 72 65

Leave a message